UTILITY AND TRANSMISSION CONSTRUCTION SOFTWARE FOR OWNERS AND CONTRACTORS
Optimize the construction of utility and transmission projects with ALICE
ALICE applies its proprietary AI-powered generative scheduling technology to find the fastest, lowest-risk path to your in-service date. Whether you're the project owner, contractor, or consultant, ALICE helps model your project constraints and surface the time, cost, and risk hidden in your schedule.
PLANNING AND SCHEDULING SOFTWARE USED BY TEAMS BUILDING MISSION CRITICAL UTILITY AND TRANSMISSION Projects WORLDWIDE
BUILT FOR OWNERS, CONTRACTORS AND CONSULTANTS
Deliver utility and transmission projects with confidence and protect your in-service date with ALICE
Explore solutions to build before you break ground
Test execution scenarios against scope, geography, and resource assumptions, so delivery strategy and in-service date commitments rest on a feasible plan, not an assumption.
Stress-test contractor schedules before award
Test the sequencing logic, resource assumptions, and outage windows a schedule takes for granted, and see how every contractor's work package fits together.
Reduce risk before it becomes delay
Analyze progress against baseline, pinpoint what's actually driving delays, and model recovery paths before a slip becomes a missed commitment.
BEST UTILITY AND TRANSMISSION CONSTRUCTION SOFTWARE
Mitigate the risks you know, and the ones you don't.
In-service dates rarely move. On one transmission program, the schedule quietly ran nine months past its grid commitment, with zero float and no flag raised. The threats to your delivery date come from two places.
Some threats to a utility schedule are visible from day one: long-lead transformers and materials, fixed outage windows, seasonal work windows, and multiple contractors feeding one master program. ALICE lets you model these and test recovery options before they hit.
Get a demo
Long-lead equipment
Late transformers, breakers, or conductors can challenge critical path work.
Fixed outage windows
Outages are scheduled with the grid operator and rarely move, so everything that depends on them has to hold.
Seasonal work windows
Weather, environmental restrictions, and marine seasons limit when work can happen, so one slip can push scope into the next season.
Contractor handoffs
Separate contractor schedules feed one master program, so a slip at one interface cascades across the others.
Some risks never show up in your status report. Preferential logic, untested sequences, hidden risks on the near critical path, and hidden resource conflicts add time. ALICE surfaces and solves them early.
Learn more about ALICE Analyze
Preferential logic
treated as fixed
Choices like installing transformers one at a time or drilling in back-to-back seasons get locked in as if they were technical requirements.
Sequences no
one questioned
Near-critical paths
no one is watching
Activities with little float can fall on the critical path after one small slip, but the plan rarely shows where and what activities truly have an impact.
Resource and crew conflicts at scale
Traditional scheduling gives you one plan. With ALICE, you can rapidly explore feasibly alternatives, each with its own time, cost, and resource profile.
Get a demo
Start from your existing schedule
Upload your Primavera P6 or MS Project file, and ALICE helps instantly turn it into a 2D view. See your schedule and its health at a glance.
Optimize based on your objectives
Track performance as you build
Project Performance shows whether your project is on track, so you can catch risks early and act before they reach the critical path.
Monitor your entire portfolio
If you're delivering multiple projects, the Portfolio Dashboard gives you a bird's-eye view of risk across every project and what you can do to mitigate them.
WHAT IS GENERATIVE CONSTRUCTION SCHEDULING?
Watch how generative construction scheduling technology by ALICE works to identify the best way to build your utility and transmission project
"ALICE gives us the ability to replan more quickly. On a button click, there are six scenarios that could help you get back on plan, and the critical path is already managed for you."
AI TECH PROVEN ON GLOBAL CAPITAL CONSTRUCTION PROJECTS
What utility and transmission teams achieved with ALICE
Owners, contractors, and consultants rely on ALICE to deliver transmission lines, substations, and HVDC converter stations. See how teams used ALICE to protect in-service dates, quantify delay exposure, and resequence work without adding resources.
A 2,382-task transmission program was running nine months past its in-service commitment, with zero float. ALICE's Targeted Optimization found that just 29 activities carried the entire risk, and targeting them brought completion two days inside the required date.
On an HVDC converter station program, a component the team called "the risk that always repeats" had only 8 days of float. ALICE quantified cost exposure from zero at a 9-day delay to over $12M at 56 days, and confirmed that a 20% acceleration would hold the milestone even in the worst case.
A reference schedule ran marine drilling back to back across two seasonal windows, with one drill already behind. By running two drills in parallel, ALICE reduced the single-season failure risk from two drills to one, with no new resources and no changed durations.
For Owners, Contractors and Consultants
ALICE delivers measurable results across the entire utility and power transmission project lifecycle, from concepting to construction.
UTILITY AND TRANSMISSION OWNERS
Built to protect in-service dates: test feasibility before you commit, validate contractor schedules before award, and see risk across your entire program.
POWER TRANSMISSION CONTRACTORS
Built to win and deliver projects: submit competitive bids, plan work around outages and seasonal windows, and recover quickly from disruptions.
CONSULTING
FIRMS
Built for analysis and mitigation strategies: test scenarios, validate schedules, and give clients data-backed options for recovery and acceleration.
ALICE PRICING
Tell us about your project needs and we’ll follow up with a consultation call to discuss how ALICE can drive results and share tailored pricing →
What type of company do you work for?
What is the size of your project?
What are your top priorities?
Which of the following best describes your business model?
What are your top priorities?
What is the construction value of your average project?
We need a bit more information to prepare your custom quote
Almost done! How should we reach out to you?
Tell us more about yourself.
Thanks!
We’ll review the information you submitted and be in touch shortly. In the meantime, check out some of these links if you want to learn more about us.
Optimize every construction phase with ALICE
ALICE gives you new planning and construction super powers.
Targeted Optimization
Identify where your schedule can be accelerated & by how much.
Analytics and Reporting
Track and analyze information that matters most to you.
Schedule Quality Score
Check your schedule score & know exactly what to fix & why.
Schedule Insights Agent
"Chat" with your schedule to get insights & recommendations.
Construction Sequencing
Solve complex constraints & intelligently sequence activities.
Construction Simulation
Explore numerous ways to build your project.
Optimization Presets
Fine-tune an ALICE simulation based on your project goals.
Risk Management
De-risk your project by modeling constraints and scenarios with AI.
AI Data Center Construction Project Scheduling Software
Resources that help you evaluate the best
data center construction software
Choosing the right general contractor for your data center construction project: a strategic approach
Select a proficient general contractor for your data center by evaluating operational needs, sustainability objectives, and future growth plans, as it plays a vital role in enhancing your company's digital operations.
ALICE for Data Centers Whitepaper
ALICE enables owners and contractors to reduce risk, delays, and cost overruns by optimizing the preconstruction planning of their data center projects.
The Future of Building Bytes: Emerging Trends in Data Center Construction
Anticipating technological advancements and a rising global demand for digital services, staying informed about evolving trends in data center construction is essential for construction professionals to meet industry demands effectively.
How to maximize construction efficiency for data center facilities
Data center construction + fabrication facilities requires a great deal of planning and precision but strategic use of today’s technologies can help.
Building data centers faster with generative construction technology
Download the whitepaper to learn more about how generative scheduling technology through construction optioneering can optimize data center construction.
Data Center Construction Project Management Software
Frequently asked questions
-
The most important factors of data center construction would be the location and land space considerations for possible growth in the future. These factors matter most because you can run into issues with not having enough space or capacity for power and cooling needs. Data centers also need backup power supplies in case of an outage, fire suppression systems for emergencies, and compliance with environmental regulation energy usage.
-
The main types of data centers are enterprise, colocation, cloud, and edge. Enterprise data centers are made by organizations specifically for their own use. Colocation data centers are created to share usage between multiple users. Cloud data centers offer virtual services. And edge data centers are built near their users for better connections.
-
ALICE software is ideal for data center construction projects because it uses AI to optimize complex schedules, resources, and explore multiple scenarios, helping to reduce construction time, risks and costs while ensuring the project meets tight deadlines and high standards–to deliver a data center construction project just-in time.
-
Benefits of using ALICE for data center construction include faster project completion, reduced risks of delays from supply chain issues, improved resource management, and the ability to quickly adjust to changes in project conditions, milestones, scope or timing, ensuring a more efficient and predictable project outcome.
-
Using data center construction project software driven by AI and advanced algorithms helps manage the complexity and scale of these projects by improving coordination, streamlining scheduling, and enhancing resource allocation, leading to more efficient project execution and reduced risks. Owners and GCs use ALICE to deliver data centers to market faster, cheaper, and with less risk.
-
ALICE works with a wide range of teams involved in the planning and delivery of data center projects. From owners and developers to EPCs (Engineering, Procurement, and Construction firms), general contractors, and trade partners, ALICE helps unify everyone around a single source of truth.
Data centers are among the most complex, fast-moving builds in the world. Electrical, mechanical, and structural systems all need to come together with precision. ALICE brings visibility and predictability to these highly coordinated teams, allowing project leaders to evaluate multiple construction strategies and resource plans before breaking ground. Whether you’re managing hyperscale builds or colocation facilities, ALICE gives your team the power to plan faster and execute with confidence.
-
Data center construction software is designed to help plan, schedule, and manage the delivery of complex, multi-stage data infrastructure projects. Traditional scheduling tools simply track tasks; ALICE goes further by using advanced AI and generative construction technology to help you design the best possible plan.
With ALICE, teams can model scenarios, explore different sequencing options, and see the impact of changes in labor, materials, or equipment. The result is a smarter, more adaptive schedule that aligns cost, time, and resource priorities — all critical for meeting the demanding timelines and uptime requirements of data center construction.
-
Leading owners, developers, and contractors use ALICE to gain competitive advantages in the delivery of data centers. Typical users include project executives, planners, schedulers, and construction managers who need a powerful way to test options and reduce uncertainty and risks.
Because ALICE integrates directly with existing scheduling data and project management tools, users across the organization can access insights and updates as plans evolve. From the estimating and preconstruction teams building initial plans to field managers adjusting to site conditions, ALICE ensures everyone stays aligned on the most efficient path forward.
-
ALICE is an optimization platform purpose-built for capital projects and developed to meet the scale and complexity of data center builds, including:
- Scenario modeling: Test thousands of construction strategies in minutes to find the optimal plan for cost, duration, and resource use.
- Dynamic scheduling: Instantly re-sequence work when scope or conditions change — without starting from scratch.
- Resource optimization: Balance labor, materials, and equipment to prevent bottlenecks and keep productivity high.
- AI-driven insights: Use data and predictive analytics to proactively identify risks and opportunities.
- Risk reduction: The ability to simulate constraints and explore options can help you proactively anticipate challenges and make data-backed decisions.
-
Most construction software helps you track what’s happening — ALICE helps you change what happens next.
ALICE is the world’s first generative construction platform, built to help teams create and optimize project schedules using data, not guesswork. Instead of managing static Gantt charts, users can explore millions of schedule variations to identify the best combination of sequencing, resources, and constraints.
When market conditions shift or designs evolve, ALICE lets teams adjust their plans and keep projects on track, consistently working to optimize projects. This level of adaptability gives data center builders the agility they need in a rapidly expanding market where speed to delivery is everything.
By combining cutting-edge AI with deep construction intelligence, ALICE enables data center teams to plan smarter, execute faster, and build with confidence.