
Generative construction scheduling and optimization designed to help you identify the most efficient path starting from your project's BIM model.
.png?width=2000&height=1255&name=ALICE%20Model%20UI_3_Frosted%20Panel%20(1).png)
Bridge the gap between design and execution with AI-powered 4D scheduling.
ALICE Model | How it works
Upload BIM model
Get started by uploading your project’s 3D model.
No model? Consider using ALICE Optimize.
Make model flexible
Add construction means & methods (recipes), to connect design with schedule & estimates.
Generate Baseline
Based on the model and parameterized project data, ALICE will generate a baseline schedule.
Explore
Solutions
Run what-ifs to optimize schedule for constraints and generate risk-reduced solutions.
Select the best solution
Compare schedules on a scatter plot, export preferred solution, or let ALICE explore more.
Not using BIM?
Explore ALICE Model
Optimize every phase with the ALICE platform
ALICE gives you new planning and construction super powers
ALICE PLATFORM PRICING
Get a custom quote, start here
What type of company do you work for?
What is the size of your project?
What are your top priorities?
Which of the following best describes your business model?
What are your top priorities?
What is the construction value of your average project?
We need a bit more information to prepare your custom quote
Almost done! Who should we contact with info about your custom quote?
Tell us more about yourself.
Thanks!
We’ll be in touch shortly to give you a customized price quote. In the meantime, check out some of these links if you want to learn more about us.
BIM Construction Project Scheduling Software
-
ALICE Pro is designed for large-scale, capital construction projects where advanced construction scheduling and construction planning can significantly impact project delivery, efficiency and outcomes.
- Industrial Projects: Its capabilities are ideal for industrial construction projects such as power and transmission plants, data centers, semiconductor fab plants, mines, battery plants, petrochemical plants, treatment plants etc.
- Infrastructure Projects: With the ability to handle extensive and intricate details, ALICE Pro is perfect for massive infrastructure projects that require meticulous planning and coordination, such as highways, freeways, bridges, viaducts, tunnels, railways, subway stations, metros.
- Capital Commercial Projects: Commercial projects with significant capital investment also benefit greatly from the sophisticated scheduling and scenario planning offered by ALICE Pro. Examples include: high-rises or skyscrapers, healthcare facilities, corporate parks, multi use facilities etc.
In essence, ALICE is tailored for projects where the scale and complexity demand advanced, AI-driven scheduling and optioneering capabilities to ensure optimal execution and cost-effectiveness.
-
Currently, Autodesk Revit (RVT) and Navisworks (NWC/NWD) are the most recommended model formats for the ALICE interface.
These formats can be directly uploaded to ALICE, but we are not limited only to Revit. ALICE can be deployed using models from any software platform that is capable of exporting geometry in DWG, NWC or IFC formats.
Examples of other platforms that are capable of such an export include Rhino, Civil 3D, Archicad, Tekla, Infraworks, Inventor, AECOsim, Microstation, OpenBridge/Road, etc. -
While we currently do not offer free trials of ALICE Pro, we understand the importance of experiencing the software firsthand. To help you explore the full capabilities and benefits of ALICE Pro, we offer personalized, live demonstrations and sandbox environments. During demos, our experts will guide you through the key features and functionalities tailored to your specific project needs. This approach ensures you get a comprehensive understanding of how ALICE Pro can optimize your construction scheduling and planning processes. Schedule time with the ALICE team to discuss your options.
-
Yes, BIM (Building Information Modeling) can be used for scheduling by integrating 3D models with time and resource data in ALICE Pro. This enables project teams to create detailed, dynamic schedules that reflect real-world construction processes, ensuring better planning and execution.
-
BIM software is a tool that creates and manages 3D digital models of buildings and infrastructure. It integrates design, construction, and operational data to enhance collaboration, reduce errors, and improve efficiency throughout a project’s lifecycle.
-
The best BIM software depends on your project needs - but leading tools include Revit, Navisworks, and ALICE Pro. ALICE Pro enhances BIM by integrating generative construction scheduling, allowing teams to analyze scenarios and optimize schedules for complex projects.
-
ALICE Pro offers several benefits for BIM users:
- Seamless Integration: Combines BIM data with generative scheduling.
- Scenario Analysis: Quickly creates and evaluates alternative project schedules.
- Improved Collaboration: Ensures alignment between design and construction teams.
- Optimized Execution: Identifies resource and scheduling efficiencies to reduce costs and delays.
-
ALICE Pro is the ideal solution for BIM users because it goes beyond traditional modeling to enable generative construction planning. It empowers teams to:
- Solve scheduling challenges efficiently.
- Adapt quickly to project changes.
- Deliver projects on time and within budget.