MINING INFRASTRUCTURE SOFTWARE FOR OWNERS AND CONTRACTORS
Build mining infrastructure faster with ALICE
ALICE applies its proprietary generative scheduling technology to find the fastest, lowest-risk way to build your mining infrastructure. Whether you're the project owner, contractor, or a consultant - ALICE helps model your project constraints and surface the time, cost, and risk hidden in your schedule.
PLANNING AND SCHEDULING SOFTWARE USED BY TEAMS BUILDING MISSION CRITICAL Mining infrastructure WORLDWIDE
BUILT FOR OWNERS, EPC CONTRACTORS AND CONSULTANTS
Accelerate mining infrastructure construction and get facilities online on time with ALICE
Explore solutions to build before you break ground
Rapidly prototype sequencing, constructability, and engineering strategies, and use AI to surface bottlenecks and opportunities while decisions are still flexible.
Reach first production sooner with AI
Run proactive risk analyses, optimize resource allocation around long-lead equipment and site constraints, and evaluate strategies to confidently select and align your EPC contractors.
Reduce project risk and protect margins
Maintain control over the critical path, contingencies, and budgets, ingest EPC data with ease, and use proven scenarios to negotiate fast delay recoveries.
BEST MINING INFRASTRUCTURE CONSTRUCTION SOFTWARE
Mitigate the risks you know, and the ones you don't.
Every day a mining facility sits unfinished is a day it isn't producing. On one port facility capital project, ALICE uncovered 123 days and $200M in savings hidden in the original schedule. The threats to your first-production date come from two places.
Some threats to a mining schedule are visible from day one: long-lead mills, crushers, and conveyors, fixed shutdown windows, remote sites with limited access, and crews constrained by camp capacity and rotations. ALICE lets you model these and test recovery options before they hit.
Get a demo
Long-lead equipment
Late mills, crushers, conveyors, or electrical infrastructure can challenge critical path work.
Fixed shutdown windows
Turnarounds must finish on time, because every hour past the window is lost production.
Remote site logistics
Weather, seasonal access, and long supply chains limit when work can happen, so one late delivery ripples across the program.
Crew constraints
Limited camp capacity and crew rotations cap how many trades can work on site at once.
Some risks never show up in your status report. Preferential logic, untested sequences, hidden risks on the near critical path, and hidden resource conflicts add time. ALICE surfaces and solves them early.
Learn more about ALICE Analyze
Preferential logic
treated as fixed
Choices like plant area order, erection sequence, or tie-in timing get locked in as if they were technical requirements.
Sequences no
one questioned
Near-critical paths
no one is watching
Activities with little float can fall on the critical path after one small slip, but the plan rarely shows where and what activities truly have an impact.
Resource and crew conflicts at scale
Conflicts only appear when you model crews, cranes, camp capacity, and contractor packages together.
Traditional scheduling gives you one plan. With ALICE, you can rapidly explore feasibly alternatives, each with its own time, cost, and resource profile.
Get a demo
Start from your existing schedule
Upload your Primavera P6 or MS Project file, and ALICE helps instantly turn it into a 2D view. See your schedule and its health at a glance.
Optimize based on your objectives
Track performance as you build
Project Performance shows whether your project is on track, so you can catch risks early and act before they reach the critical path.
Monitor your entire portfolio
If you're delivering multiple projects, the Portfolio Dashboard gives you a bird's-eye view of risk across every project and what you can do to mitigate them.
WHAT IS GENERATIVE CONSTRUCTION SCHEDULING?
Watch how generative construction scheduling technology by ALICE works to identify the best way to build your mining infrastructure project
“Our job at ECS isn't just to hand clients a schedule, it's to give them confidence that the plan is the optimized one, not just the first one that worked. ALICE lets us do that. Turning a multi-day planning exercise into a 20-minute, real-time session means we can show up to client conversations with alternatives ready, not excuses for delays."
PROVEN ON MINING AND MINERALS INFRASTRUCTURE
What mining project teams achieved with ALICE
Owners, contractors, and consultants rely on ALICE to deliver mining infrastructure, from crusher shutdowns to port and rail facilities. See how teams used ALICE to cut costs, compress shutdown schedules, and flatten resource peaks.
Facing competing work fronts and a hard 300-person site limit, ECS used ALICE to find the optimal sequence in under 20 minutes, a task that typically takes hours or days of manual rework.
Read the full case study here
Working within a 3,200-worker limit set by site accommodation, Reta Engenharia used ALICE to cut equipment idle time by 33% and labor idle time by 10%, with no impact on commissioning or production milestones.
Read the full case study here
For Owners, Contractors and Consultants
ALICE delivers measurable ROI across the entire mining project lifecycle, from bidding to execution.
MINING INFRASTRUCTURE
ASSET OWNERS
Built to get facilities online on time: test strategies before committing capital, select and align your EPC contractors with confidence, and protect project margins.
MINING INFRASTRUCTURE
GENERAL CONTRACTORS
Built to win and deliver projects: submit competitive bids, plan around long-lead equipment and shutdown windows, and negotiate fast delay recoveries with data.
CONSULTING
FIRMS
Built for analysis and mitigation strategies: test scenarios, validate schedules, and give clients data-backed options for recovery and acceleration.
ALICE PRICING
Tell us about your project needs and we’ll follow up with a consultation call to discuss how ALICE can drive results and share tailored pricing →
What type of company do you work for?
What is the size of your project?
What are your top priorities?
Which of the following best describes your business model?
What are your top priorities?
What is the construction value of your average project?
We need a bit more information to prepare your custom quote
Almost done! How should we reach out to you?
Tell us more about yourself.
Thanks!
We’ll review the information you submitted and be in touch shortly. In the meantime, check out some of these links if you want to learn more about us.
Optimize every construction phase with ALICE
ALICE gives you new planning and construction super powers.
Targeted Optimization
Identify where your schedule can be accelerated & by how much.
Analytics and Reporting
Track and analyze information that matters most to you.
Schedule Quality Score
Check your schedule score & know exactly what to fix & why.
Schedule Insights Agent
"Chat" with your schedule to get insights & recommendations.
Construction Sequencing
Solve complex constraints & intelligently sequence activities.
Construction Simulation
Explore numerous ways to build your project.
Optimization Presets
Fine-tune an ALICE simulation based on your project goals.
Risk Management
De-risk your project by modeling constraints and scenarios with AI.
AI Mining Infrastructure Construction Project Scheduling Software
Resources that help you evaluate the best
mining infrastructure construction software
ALICE for Mining Infrastructure
ALICE enables owners, EPC contractors, and consultants to reduce risk, delays, and cost overruns by optimizing the planning of their mining infrastructure projects.
Data Center Construction Project Management Software
Frequently asked questions
-
The most important factors of data center construction would be the location and land space considerations for possible growth in the future. These factors matter most because you can run into issues with not having enough space or capacity for power and cooling needs. Data centers also need backup power supplies in case of an outage, fire suppression systems for emergencies, and compliance with environmental regulation energy usage.
-
The main types of data centers are enterprise, colocation, cloud, and edge. Enterprise data centers are made by organizations specifically for their own use. Colocation data centers are created to share usage between multiple users. Cloud data centers offer virtual services. And edge data centers are built near their users for better connections.
-
ALICE software is ideal for data center construction projects because it uses AI to optimize complex schedules, resources, and explore multiple scenarios, helping to reduce construction time, risks and costs while ensuring the project meets tight deadlines and high standards–to deliver a data center construction project just-in time.
-
Benefits of using ALICE for data center construction include faster project completion, reduced risks of delays from supply chain issues, improved resource management, and the ability to quickly adjust to changes in project conditions, milestones, scope or timing, ensuring a more efficient and predictable project outcome.
-
Using data center construction project software driven by AI and advanced algorithms helps manage the complexity and scale of these projects by improving coordination, streamlining scheduling, and enhancing resource allocation, leading to more efficient project execution and reduced risks. Owners and GCs use ALICE to deliver data centers to market faster, cheaper, and with less risk.
-
ALICE works with a wide range of teams involved in the planning and delivery of data center projects. From owners and developers to EPCs (Engineering, Procurement, and Construction firms), general contractors, and trade partners, ALICE helps unify everyone around a single source of truth.
Data centers are among the most complex, fast-moving builds in the world. Electrical, mechanical, and structural systems all need to come together with precision. ALICE brings visibility and predictability to these highly coordinated teams, allowing project leaders to evaluate multiple construction strategies and resource plans before breaking ground. Whether you’re managing hyperscale builds or colocation facilities, ALICE gives your team the power to plan faster and execute with confidence.
-
Data center construction software is designed to help plan, schedule, and manage the delivery of complex, multi-stage data infrastructure projects. Traditional scheduling tools simply track tasks; ALICE goes further by using advanced AI and generative construction technology to help you design the best possible plan.
With ALICE, teams can model scenarios, explore different sequencing options, and see the impact of changes in labor, materials, or equipment. The result is a smarter, more adaptive schedule that aligns cost, time, and resource priorities — all critical for meeting the demanding timelines and uptime requirements of data center construction.
-
Leading owners, developers, and contractors use ALICE to gain competitive advantages in the delivery of data centers. Typical users include project executives, planners, schedulers, and construction managers who need a powerful way to test options and reduce uncertainty and risks.
Because ALICE integrates directly with existing scheduling data and project management tools, users across the organization can access insights and updates as plans evolve. From the estimating and preconstruction teams building initial plans to field managers adjusting to site conditions, ALICE ensures everyone stays aligned on the most efficient path forward.
-
ALICE is an optimization platform purpose-built for capital projects and developed to meet the scale and complexity of data center builds, including:
- Scenario modeling: Test thousands of construction strategies in minutes to find the optimal plan for cost, duration, and resource use.
- Dynamic scheduling: Instantly re-sequence work when scope or conditions change — without starting from scratch.
- Resource optimization: Balance labor, materials, and equipment to prevent bottlenecks and keep productivity high.
- AI-driven insights: Use data and predictive analytics to proactively identify risks and opportunities.
- Risk reduction: The ability to simulate constraints and explore options can help you proactively anticipate challenges and make data-backed decisions.
-
Most construction software helps you track what’s happening — ALICE helps you change what happens next.
ALICE is the world’s first generative construction platform, built to help teams create and optimize project schedules using data, not guesswork. Instead of managing static Gantt charts, users can explore millions of schedule variations to identify the best combination of sequencing, resources, and constraints.
When market conditions shift or designs evolve, ALICE lets teams adjust their plans and keep projects on track, consistently working to optimize projects. This level of adaptability gives data center builders the agility they need in a rapidly expanding market where speed to delivery is everything.
By combining cutting-edge AI with deep construction intelligence, ALICE enables data center teams to plan smarter, execute faster, and build with confidence.